For their Washington DC facility, news agency TIMA needed a single chroma-key and live studio, two FCP edit suites, journalist office space and a newsroom.
They also needed a roof-top position overlooking Washington DC’s iconic landmark, the White House, as well as live shots from a robotic camera.
WTS provided the system integration, equipment acquisition and installation for the project.